Schedulin
Conten
We’ve alread
seen how we can pla
one or more media
les and loop them.
owever, we can also speci
a when the pla
back will be
in and end.
1.
pen th
schedule.
s
le, located in the
schedule
director
.
2. Insert the
ollowin
two lines between the
D
f
l
Ev
n
n
DefaultEvent
ta
s. Make sure that the current date is entered i
d
rm
t
StartDate>6
23
2011<
StartDate
EndDate>6
23
2011<
EndDate
For this example, the ran
e o
dates will onl
be one da
.
. Next, add the time
rame in which
ou want the video content to pla
.
We
ve alread
seen the
Ev
n
r
n
EventStart
ta
s i
our
rst example.
peci
the time in
H:MM:
rm
t
EventStart>13:00:00<
EventStart
EventEnd>13:30:00<
EventEnd
In the example above, we’ve set the video content to pla
rom
1:00 pm - 1:30 pm in the a
ternoon. Note that
ou can speci
the time
an
e within an accurac
o
1 second, i
so desired.
ur
chedule.
s
le should now look somethin
like this
D
f
l
Ev
n
<Da
OfWeek>1,1,1,1,1,1,1<
Da
OfWeek
<StartDate>6
23
2011<
StartDate
<EventEnd>13:30:00<
EventEnd
<FileName>
la
lists
la
list.
l<
FileName
DefaultEvent
The onl
di
erence between this example and our
rst example
pa
e 23
is
th
t w
v
intr
th
r
D
n
En
D
ta
s to speci
the
eriod o
da
s in which to run the video content. The content speci
ed in th
la
l
st.
le will still loop but will onl
be presented
or 30 minutes.
STAND-ALONE MOD
EndDate>6
23
2011<
EndDate
EventStart>13:00:00<
EventStart
NOTE
I
two video events overlap one another, the Media Pla
er will
top pla
back o
the current media
le and be
in pla
back o
the next
edia
le accordin
to the schedule.
Comments to this Manuals